PROJECTS · COSTA MESA, CALIFORNIA

Praia BJJ Gym

A 5,000 SF interior build-out converting a former retail space into a modern Brazilian Jiu-Jitsu training facility in Costa Mesa.

Project Overview

Praia came to us with a former retail space and a clear idea of the gym they wanted inside it. We delivered the full interior build-out: stripping the existing tenant improvements back to the shell, reworking the underground plumbing and framing an entirely new plan within the original structure.

The finished facility holds a dedicated training floor, a private office, three restrooms with showers, a full laundry and storage room, a coffee bar and a functional workspace. The building’s exposed timber ceiling and clerestory light were kept and made the centrepiece of the space.

LOCATION

Costa Mesa, California

Orange County

SCOPE

Tenant improvement

5,000 SF interior build-out from stripped shell to open doors.

STATUS

Complete

Handed over to the owners of Praia and open for training.

Where the Project Stands

A full tenant improvement delivered for the owners of Praia, from stripped shell to open doors.

01 · Layout and Permitting

Complete — We worked from the approved plan to fit the training floor, lounge, office, restrooms and back-of-house into the existing envelope, keeping the exposed timber structure clear.

02 · Strip to Shell

Complete — Existing retail millwork, casework and partitions removed, taking the space back to its structure and exposing the original timber ceiling and ductwork.

03 · Underground Plumbing

Complete — Trenching and new underground plumbing runs for three restrooms, showers and the laundry room, with reinforcement set before the slab was poured back.

04 · Framing and Rough-In

Complete — New partitions framed throughout, with electrical, mechanical and plumbing rough-in coordinated around the existing structure.

05 · Drywall, Doors and Paint

Complete — Walls closed, finished and painted, with solid doors hung to the restrooms, changing rooms and back-of-house.

06 · Fit-Out and Handover

Complete — Training mats, reception desk, coffee bar and retail fixtures installed, and the facility handed over ready to open.