Using EB-5 Capital in Your Capital Stack

EB-5 can fill the gap between your construction loan and your equity. Here is where it fits, how it is structured and what it takes to use it well.

Every development project is funded in layers. A senior construction loan covers the largest share, the developer brings equity, and the gap between the two is often the hardest money to raise. EB-5 capital, invested by foreign nationals seeking U.S. permanent residence, can fill that gap.

Used well, EB-5 capital reduces the equity a developer has to bring and can replace more expensive mezzanine debt or preferred equity. Used poorly, it adds time, compliance cost and complexity to a project that did not need it. Here is what developers need to understand before building EB-5 into a capital stack.

Where EB-5 Sits in the Capital Stack

A project’s capital stack is ranked by who is repaid first. EB-5 capital can be placed at different levels depending on the project and the senior lender:

  • Senior loan: Typical source: Bank or construction lender, secured by the property; Where EB-5 can fit: Occasionally, as the senior loan on smaller projects

  • Mezzanine or subordinate debt: Typical source: Debt funds and private lenders; Where EB-5 can fit: Most common position for EB-5 loans

  • Preferred equity: Typical source: Equity investors with priority over common equity; Where EB-5 can fit: Common position for EB-5 equity

  • Common or developer equity: Typical source: The sponsor’s own capital; Where EB-5 can fit: Rarely; this layer is first at risk

The senior lender has the final word on what sits behind it. Many construction lenders limit additional debt on a project, which is one reason EB-5 is often structured as preferred equity rather than a loan.

Debt or Equity: Choosing the Structure

EB-5 as debt

The EB-5 investors’ capital is loaned to the project company for a defined term and repaid at maturity, typically through a refinance or sale. For the developer, debt keeps ownership intact and sets a clear repayment date. The trade-off is a fixed obligation that has to be met whether or not the project performs on schedule.

EB-5 as equity

The EB-5 capital buys an ownership interest, often preferred equity. Investors participate in the project’s results rather than receiving fixed interest, and capital is returned on sale or refinance. Equity gives the developer more flexibility on timing and fits better under a senior lender that limits additional debt, at the cost of sharing upside.

Match the term to the project

Whatever the structure, the investment term must cover construction, stabilization or sale, and the investors’ immigration timeline. A term that is too short forces a refinance before the project is ready; a term that is too long keeps capital in place after the project could have repaid it.

The Rules That Shape Your Deal

  • Minimum investment: $1,050,000 per investor, or $800,000 for a project in a targeted employment area (TEA) or an infrastructure project.

  • Capital at risk: investors’ capital cannot carry a guaranteed return of principal. Your offering documents and loan or equity terms must reflect real risk.

  • Job creation: each investor’s capital must create at least 10 full-time jobs. Construction spending is a strong source of qualifying jobs, so your budget and schedule feed directly into the job analysis.

  • Two-year sustainment: investors must expect to keep their capital invested for at least two years. Plan your repayment date accordingly.

  • Lawful source of funds: every investor must document where their money came from. That work happens on the investor side, but delays there slow your raise.

TEA Status: Why Location Matters to Your Raise

A project in a targeted employment area qualifies for the lower $800,000 minimum. A TEA is either a rural area, meaning outside a metropolitan statistical area, or a high-unemployment area where the project’s census tracts have unemployment of at least 150% of the national average.

TEA status also matters for visa availability. The 2022 EB-5 Reform and Integrity Act set aside 20% of EB-5 visas each year for rural projects, 10% for high-unemployment areas and 2% for infrastructure. As of the October 2026 Visa Bulletin, these reserved categories remained current for every country. For investors from countries with long waits, a qualifying project can mean a faster path to a green card, which makes the offering easier to market.

Timing: Plan Around the Raise

EB-5 capital rarely arrives all at once. Investors subscribe over time, and each one files an immigration petition, Form I-526E for most offerings, after committing their capital. Two timing questions drive the developer’s plan:

  1. When is capital released to the project? Many offerings hold investor funds in escrow until a defined trigger, such as petition filing or approval, a minimum raise or another condition set in the offering documents. The trigger you choose affects how marketable the offering is and when you can use the money.

  2. What funds the project until then? Because the raise and escrow release take time, developers often plan bridge financing or phase EB-5 into later draws. Your construction schedule and draw schedule should show exactly when EB-5 dollars enter the project.

Build these dates into the pro forma before you commit to a construction start. A project that depends on EB-5 capital arriving early is a project that can stall mid-build.

Compliance and Securities Considerations

An EB-5 offering is a securities offering. It is typically sold to foreign investors through private placement exemptions, which carry their own disclosure, marketing and broker rules. Developers using EB-5 should plan for:

  • Offering documents: a private placement memorandum, subscription agreement and the loan or equity documents, prepared by securities counsel.

  • A credible business plan: USCIS reviews the project’s business plan and job creation analysis, so the construction budget and schedule must be realistic and well documented.

  • Fund administration: escrow, fund tracking and investor reporting that can stand up to an audit.

  • Ongoing reporting: investors need evidence that capital was deployed and jobs were created when they file to remove the conditions on their green cards.

What Changes in 2026 and 2027

  • November 30, 2026: new USCIS filing fees take effect. The investor petition fee for most offerings rises from $3,675 to $7,850, and the petition to remove conditions rises from $3,750 to $5,000.

  • January 1, 2027: the minimum investment amounts adjust for inflation for the first time, based on the Consumer Price Index and rounded down to the nearest $50,000. The amount that applies depends on the petition filing date. USCIS had not published the new figures as of this writing.

  • September 30, 2027: the current authorization for part of the EB-5 program expires unless Congress renews it. Factor that date into raises that will run into 2027.

Is EB-5 Right for Your Project?

EB-5 works best on projects with a clear construction budget, a realistic schedule, strong job creation and a defined exit. It works poorly on projects that need capital immediately, cannot carry the compliance cost or lack a credible business plan. A builder who prepares lender-grade budgets and schedules makes every part of the EB-5 process easier, from the job analysis to investor reporting.

Ramos Construction Group develops and builds its own projects. At Mission Sierra in San Gabriel, we found the property, led the permitting, secured the construction financing and built three new residences. We bring that same discipline to the budgets, schedules and documentation that EB-5 capital requires.

Exploring EB-5 for your project?

Ramos Construction Group is a majority women-owned general contractor and developer based in Santa Ana, building ground-up and mixed-use projects across Southern California. We also offer EB-5 investment opportunities in projects we develop and build, structured as debt with a 3-year term or equity with a 5-year term.

Call (949) 688-3455, text (949) 394-4753 or visit rcgbuild.com to learn more.

Sources

This article is general information only. It is not legal, tax, immigration or investment advice, and it is not an offer to sell or a solicitation of an offer to buy any security. Any offering is made only through its offering documents. EB-5 investments involve risk, including the possible loss of capital, and approval of an immigration petition is not guaranteed. Consult an independent immigration attorney and financial advisor before investing. Program rules, fees and investment amounts change; confirm current requirements with USCIS.