SB 684 Small-Lot Subdivisions: Building and Selling Up to 10 For-Sale Homes

California now lets developers subdivide qualifying lots into as many as 10 parcels and build for-sale homes with ministerial approval. Here is how the program works and how to build a project around it.

For years, small for-sale projects in California carried the same entitlement burden as much larger ones: a discretionary tentative map, public hearings, CEQA review and the risk of appeal. On a 6- or 8-home project, that process can consume more time and money than the deal can bear.

The Starter Home Revitalization Act changed that. SB 684, effective July 1, 2024, created a ministerial path to subdivide qualifying multifamily-zoned lots into up to 10 parcels and build up to 10 homes. SB 1123, effective July 1, 2025, extended the same path to vacant lots in single-family zones. For developers who build townhomes and small-lot homes, these laws open sites that were not worth pursuing before.

The Program at a Glance

  • Effective date: SB 684 (multifamily zones): July 1, 2024; SB 1123 (vacant single-family lots): July 1, 2025

  • Maximum lot size: SB 684 (multifamily zones): 5 acres; SB 1123 (vacant single-family lots): 1.5 acres

  • Maximum parcels and homes: SB 684 (multifamily zones): 10 parcels, 10 homes; SB 1123 (vacant single-family lots): 10 parcels, 10 homes

  • Average home size: SB 684 (multifamily zones): 1,750 net habitable sq ft or less; SB 1123 (vacant single-family lots): 1,750 net habitable sq ft or less

  • Minimum new parcel size: SB 684 (multifamily zones): 600 sq ft, unless the city allows smaller; SB 1123 (vacant single-family lots): 1,200 sq ft

  • Minimum density: SB 684 (multifamily zones): Maximum allowed density, or the housing element projection; SB 1123 (vacant single-family lots): 66% of maximum allowed density, or the housing element projection

  • Approval: SB 684 (multifamily zones): Ministerial; 60 days or deemed approved; SB 1123 (vacant single-family lots): Ministerial; 60 days or deemed approved

Which Sites Qualify

  • Zoning: SB 684 applies to lots zoned for multifamily residential development. SB 1123 adds vacant lots in single-family zones. A lot counts as vacant if it has no permanent structure, or only one that is abandoned and uninhabitable.

  • Location: the lot must be a legal parcel within an incorporated city or an urbanized area, substantially surrounded by urban uses.

  • Utilities: new parcels must be served by public water and municipal sewer.

  • Exclusions: lots already split under SB 9 or SB 684, sites with specified environmental constraints, and projects that would demolish or alter protected housing units do not qualify.

What Cities Can and Cannot Require

Cities may apply objective standards, but the law limits the ones that kill small-lot projects:

  • No setbacks between homes. Units can be built side by side, which is what makes townhome-style layouts work.

  • No covered or enclosed parking mandates. Side and rear setbacks and parking standards cannot exceed what SB 9 allows.

  • Minimum floor area ratio. Under SB 684, a city cannot cap FAR below 1.0 for 3 to 7 homes, or below 1.25 for 8 to 10 homes.

  • Height. Under SB 1123, a city cannot impose a height limit lower than the existing zoning allows.

  • No standards that apply only because you used SB 684. Local rules cannot single these projects out.

Local inclusionary housing ordinances still apply, so check whether your city requires affordable units or an in-lieu fee on small for-sale projects.

Why the Approval Path Matters

SB 684 and SB 1123 projects are exempt from discretionary review, CEQA and appeals. The city has 60 days to approve or deny the subdivision; if it does not act, the project is deemed approved. Building permits are issued ministerially before the final map records, so construction can run in parallel with the map. Certificates of occupancy issue once the final map is recorded.

For a developer, that removes the two largest risks in a small subdivision: an open-ended entitlement schedule and a hearing that can kill the deal.

Ownership Options

Homes can be sold fee simple, held in a common interest development, or structured as a cooperative or community land trust. SB 1123 also permits tenancy-in-common ownership. A homeowners association is required only where the Davis-Stirling Act calls for one, which keeps operating costs and buyer dues down on fee-simple layouts.

Where a city allows ADUs or junior ADUs on the new parcels, those units do not count toward the 10-home cap, which can add rental income or buyer appeal without reducing the home count.

Designing a Small-Lot Project That Sells

  1. Start from the average size cap. The 1,750-square-foot average is a project-wide number. Mix larger end units with smaller interior units to match the market and stay within the limit.

  2. Plan utilities per home early. Ten separately metered homes need electrical service, water and sewer laterals for each parcel. Utility layout often decides how many homes fit.

  3. Repeat floor plans. Two or three plan types built in a repeating sequence cut design, framing and inspection time.

  4. Design for the final map. Access easements, shared driveways and utility easements must be laid out so each parcel can be sold on its own.

  5. Underwrite to the exit. Price the homes against nearby resale and new-construction comps before you lock the unit count.

How We Help

Ramos Construction Group runs small-lot subdivisions the way a developer would, because we develop our own projects. At Mission Sierra in San Gabriel, we found the property, led permitting, secured construction financing, demolished the existing home and built three new residences. On SB 684 and SB 1123 projects we provide:

  • Site and zoning feasibility, including minimum density and lot-size checks

  • Exit analysis and unit-mix planning to the 1,750-square-foot average

  • Design coordination, map and permit expediting, and plan check coordination

  • Utility coordination with SCE and municipal providers for separately metered homes

  • Lender-ready construction budgets and design-build or guaranteed maximum price (GMP) contracts

Planning a development?

Ramos Construction Group is a majority women-owned general contractor and developer based in Santa Ana, building ground-up residential, townhome and mixed-use projects across Southern California.

Call (949) 688-3455, text (949) 394-4753 or visit rcgbuild.com to schedule a feasibility consultation.

Sources

This article is general information, not legal, financial or investment advice. Zoning, entitlement and permitting requirements vary by jurisdiction and change over time; confirm requirements for your site with the local planning and building departments.